Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first-fix in Firdous starts with surveying the concrete frame and plotting pipe routes before walls close. We run supply lines from the main entry point and connect waste lines to a common stack. All pipes are filled with pressurized water and tested before moving on.
Firdous buildings near Firdous Co-op sit raised above the main street, which affects the main entry point and tank placement. We first set the roof tank height, then run the supply line with gentle fall to reach the lowest flat in the block. Waste from every unit slopes toward a common stack connected to the public network.
Firdous sits in Farwaniya governorate near the Sixth Ring Road, a residential family area with buildings raised above street level.
Pressure is tested at the highest and lowest points of the block together to verify uniform pressure across all floors.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, upper floors get lower pressure from the descending tank head. We install pressure reducers at set points to maintain even pressure throughout all units despite the height difference.
We run main supply pipes across the ground floor or along the roof to branch out to each wing of units. This cuts the length of individual runs and makes later inspection of clips and joints easier.
