Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Hawalli
Pipe runs laid right before walls close in Hawalli includes running complete supply and waste lines from central meters. We connect each bathroom and kitchen with copper and classified waste, then pressure-test before handing to construction.
Hawalli's buildings range from small to large, many facing busy commercial streets. Supply comes from street mains or rooftop tanks in older stock, requiring precise pressure calculation at peak draw. Waste falls toward public sewers that may be close but saturated during rain.
Hawalli lies in Hawalli governorate as a mixed residential and commercial district where older infrastructure demands rigorous testing.
In street-facing buildings we test waste with simulated flow equal to flushing six toilets together to ensure no backup.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test waste from top to bottom, fitting one-way check valves at each vertical bend. We verify each valve opens freely under pressure before walls close.
We isolate each flat with an isolation valve before testing. If a leak appears we test each line separately to pinpoint which flat has the fault, then repair only that one.
