Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Hawalli
Apartment first fix in Ministries Area starts with full planning of waste and supply runs before concrete is poured. We run rising and falling pipes through load-bearing walls, install floor traps and test every joint under hydraulic pressure before walls close.
Most apartments in Ministries Area are in government or multi-storey residential blocks with solid foundations and dense concrete columns. We set rising and falling points carefully to avoid cutting columns, and choose under-slab pipe runs that allow natural fall towards the main trap. Flats here are usually spacious with multiple bathrooms, so we must study the fall on each floor and run a separate vent stack for air release.
Ministries Area lies in Hawalli near the Government Ministries Complex, a mixed district of offices and residences where water and waste infrastructure must match heavy usage density.
Before apartment handover, every waste line is filled with water and observed for one hour to verify no leaks in the under-slab pipes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We coordinate with the structural contractor before concrete is poured to leave regular openings in columns. Pipes pass through these openings and are sealed with flexible material that allows slight column movement without pipe fracture.
Yes, vent stacks are smaller diameter and rise separately beside waste pipes, exiting at roof level to prevent odours entering units. They are tested under the same pressure and method.
