Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Hawalli
In Hawalli, first-fix routes for mixed commercial and residential buildings need careful planning because spaces are tight and old systems are in place. We draw every path before drilling and avoid existing electrical wires and pipes. Updated drawings help any future maintenance worker avoid accidentally cutting a live pipe.
Hawalli buildings are adjoined or share walls, leaving little room for horizontal routes. Water, waste and gas pipes must run side by side in dividing walls with precision. We enter from the street and lay main pipes along the building length before branching to each unit. Waste from different units collects in one central line that drops without blocking public drainage space. Small diameters are used where possible to save room. Each section is tested quickly before the next starts.
Hawalli in Hawalli governorate is a dense urban area of old and new buildings near Hawalli Co-op where space is always tight.
Because space is tight, we test every solder joint separately before moving on to save time if a leak is found.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before drilling we use a metal detector and cable finder to locate any existing wires. We drill cautiously with a handheld tool instead of heavy gear in suspect areas. We ask the building owner to provide an updated electrical drawing if routes are unclear.
We check if the old line is still in use. If not, we ask the owner for written permission to remove or reroute it. If it is active we adjust our paths to avoid it and coordinate this with the engineer.
