Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first-fix plumbing in Khitan often serves a new flat built on top of an older house. Near Khitan Co-op, the drains from that rooftop unit must find their way into a stack sized for the floors below, and the flat usually needs its own tank.
In Khitan toward Farwaniya Hospital, rooftop flats are often laid out without regard to where the stacks below run, leaving bathrooms at the far end of the roof. We plan wet rooms over or near existing stacks where possible, carry wastes in the new floor build up with proper fall, add a separate vent, and set a dedicated roof tank and supply so the new flat does not draw down the family below.
Khitan is a Farwaniya residential area near Farwaniya Hospital, where many houses have gained a separate flat on the roof.
Rooftop flats get their own tank and supply line, so they never draw water from the floor below.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Often it can, if its size and condition allow. We inspect it by camera and check the number of fixtures before connecting, and recommend a second stack if needed.
Waste pipes need a certain depth to keep their fall. If the build up is too thin, we route along walls or raise the bathroom floor slightly.
