Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Khitan focuses on efficient distribution across spacious villa plots. We run hot and cold supply and waste with precise pressure and distance calculations. Each point is tested alone then together before fixtures are fitted.
Large villas in Khitan near Khitan Co-op and Farwaniya Hospital need long distribution networks from the roof tank. We choose pipe diameter to avoid pressure loss over distance and place regular inspection points. Multiple bathrooms in one villa demand careful balancing to keep pressure even at every fixture point.
Khitan sits in Farwaniya governorate where spacious luxury villas and large residential plots are widespread.
We test flow at the farthest point from the tank before finishing because distance directly affects pressure.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Distance from the roof tank may be 50 metres or more, which cuts natural pressure. We choose larger diameter for main pipes and divide the network into sections with separate pressure sources if needed.
We draw a distribution plan starting from one tank and splitting into main branches for each villa section. Each branch is tested alone then the whole network is tested to ensure steady pressure when multiple bathrooms run together.
