Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first fix in Khitan Al-Jadida starts with raw concrete before any internal walls go up. We run cold and hot supply from the main riser and cut waste channels on a steady fall to the stack. Every branch is pressure-tested before handing the site to the plasterers.
New apartments in Khitan go up quickly, and rapid development means contractors order plumbing and electrics in one phase before walls rise. We measure distances from the main stack to every bathroom and kitchen sink and calculate the fall needed for drains. Supply lines run inside ceilings and hollow walls, main waste pipes slope consistently downward without air pockets. Everything is sketched before we cut and chase to prevent crossings.
Khitan Al-Jadida lies in Farwaniya governorate, a recent development zone of medium-sized residential apartments.
Every supply and waste line is pressure-tested at working pressure for five minutes before walls are closed.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Right after floor and column concrete is poured, before masons start closing walls. If we arrive late, chasing through set concrete breaks the rebar and weakens the frame.
We stop immediately, photograph the site and send notes before we start cutting. Fixing the error on paper is far easier than rerunning pipes after plaster goes on.
