Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Mubarak Al-Kabeer
Bathroom rough-in in Masayel starts with a precise wall survey before construction to map pipe routes. We run hot and cold supplies and waste with correct slopes and secure every joint before boarding closes. Pressure and flow testing under full load checks for leaks before walls seal. This prep work now saves years of hidden problems later.
Masayel houses typically sit on multiple storeys with bathrooms on each floor, meaning long runs of pipe climb and drop through the walls. We plan steady falls in waste runs so water does not pool in horizontal sections, and we check the roof tank height to ensure adequate pressure in upper floors. Every outlet gets tested before finishes are set, because fixing a leak behind tiles later means breaking walls.
Masayel sits in Mubarak Al-Kabeer governorate, a dense residential zone where houses stand close together with tight floor plans.
We run each waste line under full flow for ten minutes because long runs hide bends that trap air pockets.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the vertical distance between tank and outlets, because each metre of height gives roughly 0.1 bar of pressure. If the gap is small we suggest a small booster pump to restore flow at peak times.
We pitch each horizontal section between 1 in 50 and 1 in 70 slope, and we tighten bends and changes to keep water moving fast. Waste lines are flushed under strong flow before handover.
