Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Mubarak Al-Kabeer
Kitchen pipes in Masayel are laid on the concrete block walls before finishing starts, with routes marked for supply, waste and vent. We run hot and cold feed, waste and vent in the positions that match your sink and cooker placement. Every run is clipped down and pressure tested before the boards go up.
Masayel homes usually need long runs from the distribution point to the kitchen, especially if the kitchen sits in a far wing away from the entrance. We calculate the fall and length of the waste line and ensure hot-water pipes are wrapped with thermal insulation before boarding up. For longer runs we use copper tube to handle pressure and heat better than plastic.
Masayel is in Mubarak Al-Kabeer governorate, a residential zone of modern villas with varied floor plans that need precise pipe routing.
Every run is held under constant hydraulic pressure for ten minutes before walls close, because a leak found after boarding means breaking out everything.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually four pipes: one for cold, one for hot, one for waste and one for vent. If you have a dishwasher we may run separate waste or tie it into the main drainage line.
Plastic works for short runs and normal pressure, but copper suits longer distances and hot-water lines because it tolerates heat and stress better. We choose based on the run length and expected load.
