Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Mubarak Al-Kabeer
Drainage-first install in Masayel starts right before concrete pours. We run waste lines from every bath and kitchen, set floor traps and vent stacks with proper fall toward the collection chamber. Every joint and slope is tested before the slab closes over it.
Masayel homes sit close together with relatively shallow foundations, so waste lines must start with proper fall from ground floor upward. We set floor traps in every bath and kitchen at heights that let water flow naturally to the collective tank. Vent pipes must reach roof level before the ceiling closes because foundation settling can block them later.
Masayel lies in Mubarak Al-Kabeer governorate, a residential zone where shallow-depth foundation building is common.
Before the slab pours, we run a full-pressure water test on every drainage section to check for underground leaks.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We lay drainage on compacted sand bed and test promptly before backfill, then retest after initial settling. If subsidence occurs, we manage it by adding gradual lift adjustments in the line itself.
Yes, but the main line must start at sufficient pipe diameter and hold steady slope from first connection to tank. We use smoke testing after pour to confirm no blockages exist.