Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Hawalli
Pipe and wire routing in the Ministries Area begins with careful study of the new office building's engineering plans. We map copper and steel pipe runs on walls and columns, measuring distances from floors and soffits. We mark all holes before drilling and lay pipes and conduits together before plastering and finishing.
Office buildings near the Civil Service Commission Complex demand strict separation of routes. Copper supply pipes for cold and hot water run horizontally with steady fall toward the stack, and horizontal pipes cross high-voltage electrical cables only inside protective metal ducts. On upper floors we check that the vertical supply riser sits away from soil and waste stacks.
The Ministries Area in Hawalli is a dense administrative district where new buildings need tight coordination between trades before walls close.
Before handover every section of pipework is pressure-tested for one hour because concrete walls are sensitive to delayed leaks.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We bend pipes around rebar at correct angles or run them through protective steel sleeves before concrete is poured. We check structural drawings first to avoid thick vertical and horizontal steel.
Yes, copper is insulated with polyethylene foam to prevent heat loss, and wires are pulled in separate conduits to avoid heating. We maintain ten centimetres between hot water runs and electrical routes where possible.