Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Hawalli
Drain lines laid right in the Ministries Area start before the concrete slab pours. Government and administrative buildings here need complex waste systems connecting multiple floors and departments. We run the waste, vent and trap lines beneath the slab with consistent fall. Each line is tested before the slab covers it.
Government ministry buildings here typically have multiple floors with distributed bathrooms and different-use sections. Waste lines must gather effluent from several storeys into one vertical stack running inside walls or dedicated shafts. We fix floor traps under each collection point and set cleanout boxes at bends and junctions. The fall must stay steady over every metre to prevent stagnation and odour.
The Ministries Area in Hawalli houses Kuwait's Government House and major administrative bodies, a district of dense official buildings.
Before the slab pours, we blow air through every waste line to catch any blockages or debris trapped inside.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before pouring, we fill the line with water under pressure and monitor the level for an hour. Any drop shows a leak in a joint or pipe and we repair it immediately before coverage.
Yes, but each branch must feed the vertical stack at 45 degrees or less with a steady downward slope. We fit a vent valve at the top to let air in and stop air locks that block flow.
