Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Apartment pipe runs in Naeem demand complete coordination between pipe routes, architecture and electrics. We install main pipes before electrical work starts to avoid cutting supply lines later. Correct waste fall is essential because Naeem flats may sit at slightly different heights. Every line is pressure-tested at full load before walls close.
Naeem flats typically sit in blocks of four to six storeys with regular bathroom and kitchen placement. The main supply riser runs through the building centre and we must calculate waste fall from the farthest flat on each level. Long horizontal distances from riser to the end flat may mean we need small pumps or larger bores in some cases. We also check pipe fixing to prevent vibration when taps are opened quickly.
Naeem is situated in Jahra governorate, a residential zone with medium-rise blocks distributed in regular patterns.
Pipes are fixed with metal brackets every metre or so to prevent movement and vibration when taps are used.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a small electric pump in the basement room to push water to all flats at equal pressure. Before choosing the pump we measure distance and height to select the right size.
We secure pipes firmly with strong metal brackets at regular intervals. We also add pressure-control valves on main lines to absorb sudden pressure surges.
