Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
First-fix routes in Naeem are designed by building type, as new villas differ from renovated older homes. Water and waste pipes run in separate chases from electrical, and every joint is pressure-tested before construction closes. Electrical goes in only after water pipes are confirmed leak-free.
Naeem has a mix of apartment blocks and individual villas, so we handle varied tank sizes and fixture counts per project. Apartment stacks need larger vertical drainage pipes with vent breaks every three floors. Single villas use one smaller waste line to a private pit. Wiring runs in upper chases or under floors, and we brush and flush every conduit before handover.
Naeem is a mixed-use Jahra area with both apartment buildings and detached villas, requiring flexible route design.
Vertical waste stacks in blocks are tested by filling the top cistern and checking for leaks at every joint before closure.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Blocks need larger vertical stacks and many vent openings because bathrooms are numerous. Single villas use one direct waste line and a small tank suited to one family.
Yes, blocks use 110 mm stacks while villas use 75 mm. The larger bore handles flow from multiple floors without choking or air locks.
