Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in a Qairawaan house starts by checking the foundation and raised floor to map pipe runs underneath. We route hot, cold and waste and test them with water and pressure before the floor is closed. Fixing pipes to metal hangers stops vibration when water flows. Tight closure precedes carpentry work.
Qairawaan houses are family homes with raised floors to prevent seasonal ground moisture. This clearance provides good space for water and waste pipes running underneath. We measure this space first to decide pipe sizes and layout, as some homes have ground-floor waste near the guest bathroom. We locate feed points from well and tank and trace every branch to its outlet in bathroom or kitchen. Waste must slope steadily toward the house trap without pooling.
Qairawaan is a residential area on Seventh Ring where houses connect to independent drain systems linked to isolated soakaways.
We check waste slope with a spirit level along every run to ensure steady flow without trapping.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, polyethylene pipes withstand temperature swings under a protected floor. We clamp them with metal clips every metre and wrap them in foam if they are near light.
We break the long run with an inspection collar at midpoint to ease future unblocking. Each section slopes toward the collar at a consistent angle of at least 1 centimetre per metre.
