Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
First-fix plumbing and electrics in Qairawaan starts by reviewing the engineering plan for identical residential towers built together. We run vertical pipes through concrete columns and horizontal lines under the slab, testing each apartment unit by pressure and insulation before walls close.
Qairawaan residential towers have evenly distributed load-bearing columns, allowing standardised vertical pipe routes from ground to roof. Each unit has one entry with separate supply lines from a shared vertical riser. We align testing to structural progress, checking columns before slab pours and each apartment before handover to the fit-out contractor.
Qairawaan sits in Kuwait City on Seventh Ring Road, a district of modern residential towers with repeating floor layouts.
Each tower is divided into test zones by vertical risers so we complete one section before moving to the next.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, a branch runs from the shared riser to each apartment entry, with each unit having its own distribution under the slab. We pressure-test each apartment separately before walls close.
After each riser is fully assembled and before formwork and reinforcement for the slab. We fill the column with water and check for leaks at every joint while concrete is still accessible.
