Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Sawaber starts by routing hot and cold lines from the central riser in the stairwell or corridor to each unit. We install pressure-rated copper pipes and test full performance under load before handover to the interior contractor.
Sawaber residential towers near the Commercial Complex have multiple units per floor with central waste risers, each unit with its own distribution box in the corridor. We inspect the distribution box and confirm main supply capacity before branching to bathroom and kitchen. Waste drops vertically to the main stack in the ceiling, and we carefully monitor horizontal falls in the floor to avoid water pooling.
Sawaber in Kuwait governorate near the Commercial Complex is an area of tall residential towers with high density of rental and owned units.
Before handover we open each tap in the new bathroom separately and measure flow rate for each one because weak flow may signal a blockage in the branch line.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We do not recommend it because pressure will drop if both units use taps together. Each unit needs a separate branch from the distribution box with its own isolation valve for independent maintenance or repair.
We install a floor trap in the corridor outside the unit, connected to the main stack via a separate pipe. If the stack backs up, water overflows to the trap instead of entering the units.