Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first-fix in Sawaber addresses modern residential towers with centralised distribution. We place hot and cold outlets from main distribution columns and run waste and vent lines precisely before closure. We pressure-test and flow-check each unit before moving to the next floor.
The Sawaber complex has tall residential towers, each with a central water distribution column and multiple drain stacks. Residential units are uniform and kitchens have the same layout, allowing learning across units. Each supply line branches from the central column to a standard outlet and runs standard plastic pipes inward. Waste lines fall toward dedicated drain stacks for each sector. Vent pipes pass through exterior walls or unit ceilings.
Sawaber is a large residential complex in central Kuwait near downtown towers, with dozens of modern housing units.
Each unit is tested at full flow with both cold and hot together for three minutes before closure.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Main pipes run through thick party walls or behind isolated runs in corridors. We use flexible sleeves around pipes at tight openings to prevent chafing.
Yes, long runs lose heat and take time to fill with hot water. We use foam-insulated pipes and can advise on optional hot circulation pump installation.
