Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Jahra
Kitchen first fix in Sulaibiya Industrial requires approval from site management and main contractor. We run heavy steel pipes from the main water tank and set waste separate from industrial cooling systems. All pipes are tested under high pressure before closure. Venting reaches the roof without crossing other industrial ventilation.
Industrial facilities in Sulaibiya Industrial have large water tanks, complex cooling systems and solid concrete floors. Kitchen pipes run from the main tank through designated routes fixed with steel clips to walls. Waste drains to a separate trench away from cooling water. Drain and vent openings must be pre-agreed before work starts.
Sulaibiya Industrial zone in Jahra governorate houses factories and heavy plants where floors and walls carry heavy structural loads.
We use carbon steel pipes two point four millimetres thick because cooling systems draw cold water that causes condensation.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Never. They are completely separate. Cooling water contains chemicals that react with soap and grease from the kitchen.
At least five metres, ideally in opposite directions. We check the site plan with the contractor before digging any lines.