Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
Pipe and wire routes in Sulaibiya Industrial serve large factories, workshops and storage units. We run heavy water supply lines in metal conduits under thick concrete floors and separate clean waste from production discharge. Every route is inspected and pressure-tested before operations begin.
The industrial zone has large factories and workshops with reinforced concrete floors 30 cm thick or more. Copper and steel pipes are buried under the floor slab before pouring, and we leave access boxes at set points for maintenance. Production wastewater needs treatment, so we route it to a separate settlement tank before final disposal.
Sulaibiya Industrial sits in Jahra governorate, a planned zone for light and medium industry with strict building codes.
Heavy discharge pipes are tested at 50 litres per minute for four hours to ensure the foundation will not be undermined by excess water.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We route two separate discharge lines from the start, one for clean water and one for heavy waste. Production discharge goes to a settlement tank first where heavy particles settle before disposal.
In factories, above-floor pipes take up space and block movement, but are possible in some areas. We choose sub-floor installation to save space and protect pipes from damage and industrial heat.