Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Mubarak Al-Kabeer
Bathroom rough-in for a villa in Abu Hasaniya starts by mapping hot and cold water routes from the water heater to the shower and taps. We run waste pipes from shower, sink and toilet to the main floor trap. We test every joint and every fall before the walls are tiled.
Abu Hasaniya seafront villas sit on raised hard ground with first-floor bathrooms above ready-made garages below. Rough-in needs shallow trenches cut through the existing concrete slab to run pipes. Waste drains downslope to floor traps set in the rear courtyard away from the foundation. Hot water pipes must be insulated against heat loss in the coastal wind. We test drainage under full simultaneous flow from all points to confirm the trap doesn't overflow under heavy load.
Abu Hasaniya lies in Mubarak Al-Kabeer governorate, a seafront villa zone where rough-in must endure high moisture and salt air.
Because seafront ground is very damp, we test both hot and cold pipes together to spot any leak before burial.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we cut narrow channels in the concrete, lay pipes carefully and refill with new concrete. This preserves the slab structure without raising it.
The trap must sit at least one and a half metres from the foundation to prevent water seeping toward the sub-floor tank. We place it in the rear courtyard where ground slopes away.
