Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Mubarak Al-Kabeer
Drain layout in Abu Hasaniya requires care because sea-facing villas often have natural slopes that run the wrong way. We run waste lines from each villa on a clear fall toward a central pumping station. Air is vented from each line via vertical stacks. All joints are tested with water before burial under soil and paving.
Villas in Abu Hasaniya stand on a hillside facing the sea, with ground sloping toward the beach while main sewers run the opposite direction. We use pumps to lift waste lines or build raised collection tanks in each villa cluster. Vent stacks are fitted at least fifty millimetres in diameter to prevent air locks. Kitchen and bathroom waste is collected in one sealed tank before being pumped up to the main sewer line.
Abu Hasaniya sits in Mubarak Al-Kabeer governorate, a high-end waterfront villa zone on the Gulf coast.
Lift pumps are tested by running test water for fifteen minutes in steady flow before handover because a pump failure in use leaves the villa without drainage.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The pump needs a volume of water before it starts, so the tank collects that amount and runs the pump in one batch instead of hundreds of times daily. This extends pump life and cuts power use.
The drain pipe carries water and waste toward the tank or treatment. The vent stack pulls air from inside the line so pressure does not drop and jam the water flow. Both must be fitted together in every modern drainage installation.
