Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Dasma starts with a full survey of the structure before walls and ceilings close. We run hot and cold lines to every fixture point and lay waste pipes with steady fall under the slab. Every joint gets hydrostatic pressure testing before walls seal.
Old residential towers in Dasma have thick concrete floors and the main vertical stack far from the building corner, so the bathroom waste run must travel a long distance under the ceiling to reach it. We calculate the required fall over that span and support pipes with strong clamps to prevent sag over time. We fit access points along the waste route for future cleaning.
Dasma lies in Kuwait governorate near city centre, where mid-rise residential blocks sit with ageing drainage systems.
Cold and hot branches are tested separately under pressure before finishing because combined load lines carry different stress.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The practical minimum is 1 to 2 cm per metre of run depending on pipe diameter and expected load. In Dasma we model the route with a spirit level before final fixing to confirm the fall holds throughout.
We run a long horizontal waste under the ceiling then riser it at a nearer point, or fit an air admittance valve at the new branch top to prevent airlock. Either solution keeps water and gases flowing.
