Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
Pipe and wire first-fix in Dasma begins by reading the building plan and marking supply and waste points on raw walls. We run copper and polyethylene pipes alongside heavy and light electrical wires before concrete is poured and walls are closed with tiles. Every route must clear other services and avoid final fixture points. Each circuit and water line is tested before walls are sealed.
Most old-style Dasma apartment blocks have multi-storey units with bathrooms and kitchens stacked vertically on the same column. This layout means supply and waste pipes must rise and fall sharply through narrow spaces between concrete pillars. We map the shortest routes from the roof pressure tank downward and waste toward the horizontal main, avoiding future ceiling drops and decorative finishes.
Dasma sits in Kuwait governorate near commercial and government centres with dense residential apartment blocks nearby.
Before handover, every pipe run is tested under air pressure for leaks and all wires are loaded under full current draw.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We space the two pipes vertically at least 30 centimetres apart and use metal clamps to hold each pipe in position. Waste always runs in front of supply toward the outer wall.
We test immediately after installation under pressure and load to catch defects early. We test again just before the next trade starts to make sure site movement has not damaged anything.
