Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Khitan Al-Jadida starts with a site survey and agreement on toilet and basin placement before concrete is poured. We run supply and waste lines through walls and floors and test every pipe under pressure. We set toilet bases, sink and shower rough points and mark the connections for the finisher. Later finishes sit on a sound, leak-free base.
Khitan Al-Jadida has new-build homes, many still under construction or finishing out. Main bathrooms are spacious with shower, basin and sometimes extra toilet fixtures. At this early building stage we run pipes before walls rise fully, ensuring correct waste falls and spacing between hot and cold lines. We pressure-test every joint before floors and walls close.
Khitan Al-Jadida lies in Farwaniya governorate, a newly developing residential area where early rough-in planning prevents costly faults later.
Before the floor closes, test water runs through every drain point and sits for an hour to confirm no leaks.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before or just after concrete pour, ideally you call us before floor reinforcement is laid. We mark required positions and coordinate scheduling with your builder.
We use a water level and measure from each fixture drain to the main outlet, correct fall is roughly one millimetre per metre. Pipes are supported on levelled bases before the floor closes.