Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in Uyoun starts by running hot and cold lines from the meter to every fixture point before walls are built. We test pressure and flow on each branch and confirm no leaks at any joint. Hidden pipes after successful testing give a leak-free bathroom for years ahead.
Uyoun houses near Uyoun Co-op often have two storeys with multiple bathrooms, and supply lines must reach from a roof tank or pressure pump. We route copper or plastic pipes through the foundation and internal walls before tanks are fitted. Waste needs steady fall toward the main sewer line, and we check the run length from each bathroom to size the pipe correctly.
Uyoun lies in Jahra governorate and is known for its natural springs, where most residents rely on roof tanks to collect their water supply.
Before any wall is closed, we fill every line with water and compressed air to check for leaks under normal working pressure.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A single bathroom branch usually needs half-inch pipe if the run is short and the roof tank is close. We test pressure and flow at the fixture point before walls close to ensure it fills a sink in reasonable time.
Under the slab is possible if it is wrapped for protection and marked on the plan before concrete is poured. In Uyoun we prefer walls because fixing a leak under the slab is very difficult and groundwater may corrode metal pipes.
