Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Pipe work for new apartments in Uyoun begins when the concrete structure is ready but floor screeds are not yet laid. We run supply and waste lines from the main riser and fix service points for each bathroom and kitchen. Every pipe is air-tested under pressure, then sealed before wall closure starts.
Uyoun apartment blocks are often mid-rise with three to five storeys and a central supply riser in the basement. We check with the contractor that the riser delivers enough pressure to the top floor, and watch for leaks where copper meets steel piping. Waste naturally falls to the main stack and we flush all drain lines before final water testing.
Uyoun lies in Jahra governorate near Al Uyoun Co-op, a growing residential district where new apartment projects are expanding rapidly.
We pressurize pipes with compressed air for one hour because any pressure drop signals a pin-hole leak at a joint.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Right after structural concrete is poured and before final floor screeds are laid. This timing lets us route pipes through the slab and fix joints without being rushed.
We pressurize each line with steady air for one hour and monitor the gauge. Then we run water from the main riser and inspect every joint both visually and by touch for wetness.