Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
Pipe and electrical first-fix in Uyoun starts with new construction frames before interior concrete pours. We run water and waste lines parallel to electrical conduits through block walls, then pressure-test and leak-check before the build closes.
Near Al Uyoun springs, modern villas stand on large plots with basements and roof tanks for water storage. Supply lines climb from the foundation to the roof at an even pace, and waste lines fall toward the mains with steady falls. We connect all outlet points on each floor before the walls close, and mark every run clearly so later work does not puncture pipes.
Uyoun lies in Jahra governorate east of Kuwait, a district of upmarket villas around natural springs.
Every water line is pressure-tested at 10 bar for a full hour before walls close.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper or PEX with mechanical fittings rather than solder for underground sections. Each joint is visually inspected and high-pressure tested before the earth is backfilled.
Always; we leave 5 cm clearance between any electrical conduit and hot water pipe. If they must cross, we fit an insulating barrier between the pipe and conduit to prevent heat transfer.
