Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Jahra
Drain-line layout in Uyoun begins right before the slab pour. We run waste lines from every floor level, bathroom and kitchen at a steady fall toward the main pit. Routes pass under the foundation at safe depth and cleanout access points are positioned away from traffic zones. Every line is water-tested before the concrete sets.
Houses in Uyoun near Al Uyoun Co-op are built on gently sloping land toward the east, meaning natural fall exists but its direction must be checked. We measure from ground-floor bathroom level to pit location and calculate the drop in millimetres per metre. Where houses are closely spaced, waste lines are routed so they do not interfere with each other or cross the fresh-water inlet.
Uyoun is a historic site in Jahra where natural springs created an ancient settlement hub.
Waste routing is fixed before concrete pours because adjusting it after curing requires breaking the foundation.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The standard is between 1 and 2 centimetres drop per metre of pipe, or 1:100 to 1:50. Less than this traps solids and more than this separates liquids from heavier matter.
We place a cleanout at every direction change and space them at least 30 metres apart on straight runs. This allows a cleaning cable to be fed from either end without disturbing the slab.