Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Mubarak Al-Kabeer
Drainage-first foundation in Sabhan Industrial starts with a flow map for each warehouse or factory. We run waste lines at precise slope from production zones and toilet blocks toward a central treatment area. Floor traps and water collection install before concrete pours. Full pressure test confirms every joint is sound.
Sabhan Industrial buildings are large and split into production zones, toilet blocks and washdown areas, each needing its own trap. We install a network of main pipes collecting from every zone at equal slopes toward a shared tank. Industrial floors are usually thick concrete, so we map channel depths and pipe runs before the pour.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate, a warehouse and factory zone requiring complex, documented drainage systems.
We document every collection point and drain line with drawings and photos before concrete pour, because later access is extremely difficult.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if floors are roughly level and distances reasonable. We install isolation valves in each warehouse so one can be shut off without affecting others.
We install a separate collection trap for production water with larger bore and steeper slope. This water goes to a different treatment tank or simple settling tank before final discharge.