Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Capital
Drainage-first installation in Shuwaikh Industrial requires tight coordination with contractors and engineers. We map all waste lines from workshops, washrooms and bathrooms a week before the concrete pour. Every vent stack is tested under compressed air. Solid drainage supports factory operations every day.
Factories and warehouses in Shuwaikh Industrial have multiple worker wash stations, toilets and drains spread across large floors. We plan every waste route to meet a central sump before connection to the municipal network. We fix floor traps in maintenance and wash zones with cleanout access at regular intervals underground.
Shuwaikh Industrial sits in Kuwait Governorate between Third Ring Road and the shore, where factories and warehouses rely on organized drainage systems.
Every water test is logged on site before the foundation is sealed to track the integrity of each line.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but the sump size must be calculated from the number of toilets, washrooms and drains in each section. We install a cleanout at the entry point of each major branch for easier maintenance.
We install a small lifting station with a tank, air vent and submersible pump that runs automatically. The lift station takes wastewater from the low line and pumps it under pressure to the main sump.
