Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first fix in Shuwaikh Industrial requires special planning because factories and large warehouses need work kitchens across wide spaces. We route supply and waste to serve multiple work stations while avoiding heavy machinery.
In Shuwaikh Industrial warehouses and factories, spaces are long and ceilings high, meaning long supply runs that need extra support and waste pipes maintaining fall over great distances. We coordinate with electricians and builders before work starts to avoid pipe clashes with cables and ducts. One waste line may serve multiple work sinks, so we test flow and venting under heavy use to prevent bottlenecks.
Shuwaikh Industrial sits within a dedicated industrial zone focused on factories, warehouses and logistics in the capital.
Factory waste lines are tested under steady flow because peak morning use reveals poor venting immediately.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, multiple sinks can branch into one stack if pipes maintain proper fall and an air vent sits at the top. We position sinks to allow shared drainage to flow smoothly.
Length doesn't cause leaks if we pressure-test before handover, but proper bracing cuts vibration and noise. We fit isolated clips roughly every metre to secure the pipework.
