Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Shuwaikh Industrial differs because warehouses and factory floors are reinforced concrete and steel, making wall chases difficult. We run pipes externally on walls or under raised flooring, and pressure-test each line before capping.
Warehouses and factories in Shuwaikh Industrial have small worker bathrooms often remote from main stacks. We use exposed pipes fixed to walls with metal clips every 1.5 metres to withstand machine vibration. Waste lines run at obvious fall toward a floor drain or sump, and we pressure-test and flush before site handover.
Shuwaikh Industrial sits in Kuwait governorate and is a zone dedicated to factories, warehouses, logistics hubs and transport centres.
Waste pipes in industrial buildings need blockage checks every six months because industrial debris builds up quickly.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, this is best practice in industrial buildings. We run pipes under steel beams or along ceilings and secure them firmly, then locate joints at bends for easy maintenance access.
We use heavy copper or welded steel pipes instead of plastic. We secure them with brackets fitted with rubber pads to absorb vibration and pressure-test each joint at 8 bar.
