Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
Pipe and wire routes in Shuwaikh Industrial are laid before warehouse and plant roofs are installed. We plan public water distribution and industrial drain points, then run wires from distribution boards to cooling units and pumps before walls close.
Industrial buildings in Shuwaikh Industrial are high-bay warehouses with metal roofs and heavy-load frames. Large pipes feeding cooling and heating units need high headroom to pass over containers and machinery, so we run them horizontally beneath the roof structure before the pour. Industrial drains need grease and settlement separation before the main line, so we install a separator box near the first outlet and test full-load flow.
Shuwaikh Industrial sits in the heavy-industry zone of the capital where sheds, warehouses and light manufacturing plants cluster.
Every grease separator is tested by pumping water with industrial fat to check the barrier before production starts.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Size depends on daily discharge volume and usage intensity. We calculate it from the number of supply and drain points, then select a separator tank holding three times daily flow.
Yes, wires above 10mm² run in sealed metal conduits to protect them from moisture and industrial dust. We properly ground them at each junction.
