Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
First-fix plumbing and electrical runs in Kaifan start with site plan review and routing design for residential and commercial plots. We lay supply lines from the central meter through foundations and connect waste points to main sewers. Every route is inspected and tested before walls and foundations are closed.
Land plots in Kaifan near the Co-op need special handling because foundations are often deep and soil is hard. We mark pipe routes before piling and foundation work, then lay copper pipes with metal protection when buried. Electrical wires go in separate ducts protected from moisture. Entry points from the street to each plot are pressure tested independently before construction starts.
Kaifan is a residential and commercial district in Kuwait City overlooking Kuwait Sporting Club, where land plots of varying size are spread across the area.
Before burying water pipes we wrap them in plastic protective sleeves, clean out debris and test them at 12 bar.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we need exact architectural drawings showing pile depth and foundation levels so pipes do not run in dangerous positions above or below them. We coordinate with the site engineer before laying any underground pipes.
We wrap pipes in a 10-centimetre sand layer then add a plastic sleeve, then backfill gently. This protects pipes from direct pressure of rocks and compacted soil.