Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first fix in Kaifan begins in family villas where the prep area often opens onto a central courtyard. We lay hot and cold supply, waste and vent lines under the slab before final concrete pour. Every line is pressure-tested and fall is checked before any wall closes.
Villas in Kaifan near Kaifan Co-op and Kuwait Sporting Club have kitchens tucked in corners far from the main entrance, meaning long supply runs under the slab from the main meter. Waste must flow to an inspection chamber in the courtyard before connecting to the public sewer. We measure existing trench depths and available fall to ensure new pipes do not conflict with old ones.
Kaifan lies in Kuwait governorate near Kaifan Co-op and Kuwait Sporting Club, a district of established villas with wide central courtyards.
Supply lines are tested at steady pressure for 30 minutes watching for any drop, because older Kaifan villas may have weak legacy pressure.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use pipes with thick thermal insulation and keep the route as short as possible under the slab. We fit a shutoff valve near the hot outlet to reduce dead volume between the heater and the far end.
We stop and document its position and reroute the new pipes on a path clear of it. We maintain a 30 cm safety gap between different pipes to avoid thermal interference.
