Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Farwaniya
Kitchen first-fix in Khitan Al-Jadida means planning all pipe runs before concrete sets and walls close. We run hot and cold supply lines from the roof tank with proper pitch into the main waste stack. Vent openings are positioned to pierce the ceiling before finishes go on. Everything is tested under pressure before walls are covered.
Khitan Al-Jadida is modern apartment blocks with properly-sized kitchens and straight concrete walls. The kitchen is usually in a corner near the main bathroom, so the waste line can join the common stack easily. We position vent openings in the concrete ceiling before it is poured, because cutting one later costs far more. Every joint is pressure-tested before concrete cover goes on.
Khitan Al-Jadida lies in Farwaniya governorate, a residential apartment zone where common risers already run through the central shafts.
Every branch is pressure-tested before concrete pours because access is impossible once walls are closed.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before the concrete ceiling is poured, because cutting through a finished slab means breaking and re-enforcing. We mark the position clearly on the plans and flag it on-site before any pour happens.
Yes, if they are close. Individual branches tie into the common stack at a single point before the black tank. We verify the pitch on each branch to keep drainage moving.
