Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
Pipe and wire routing in Khitan Al-Jadida begins with reviewing architectural drawings and distribution layouts. We locate vertical risers and horizontal branches in wall cavities before concrete sets. All runs are tested, leaving the site ready for next trades.
Modern residential buildings in Khitan Al-Jadida are built on concrete foundations with block-work walls, demanding tight coordination between water, waste and electrical runs. We lay supply and waste pipes in floor voids and wall cavities before they close, leaving gaps for service passages. Electrical conduit runs in separate metal channels at safe distance from pipes, and insulation and circuit paths are tested before anything is covered.
Khitan Al-Jadida lies in Farwaniya governorate, a modern residential development zone where multiple contractor projects run in parallel.
Every waste line is filled and drained without pressure before closure to catch leaks at hidden joints.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Water and waste routes are drawn first, then electrical conduit is installed at least 5 cm clear. Every route is marked on plaster before closure so no one drills later.
Pipes are filled, drained and visually inspected at every joint. Wires are tested with a megger for insulation, and each circuit is logged before closure.