Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Jahra
Kitchen first-fix in Qasr starts by reading structural drawings and marking sink position on the floor before work begins. We run the supply line from inside or outside based on fall, and set the waste with steady gradient toward the main. We install the trap and vent together before any plasterboard.
Qasr private houses are often adjoined or semi-detached, meaning kitchen walls may be load-bearing. Before opening any wall we check structural drawings to know where columns and beams sit. The waste line cannot bend sharply over a beam, so we plan the route early. The supply line is run in corrosion-resistant pipes as walls may be damp before handover.
Qasr is an established residential district in Jahra governorate with older and newer private houses where load-bearing walls can be complex.
Before closure, water and waste are run together and every threaded joint is checked by sight and hand to ensure correct tightness.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we choose an alternative spot nearby where no beam exists and where fall is available toward the main drain. If the distance is too large we suggest a small underground lift tank instead.
Pipes and outlets must be installed before closure, but the sink itself can be fitted later. We leave pipes at standard length reaching the inner wall, ready to be cut when the sink is finally installed.
