Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Pipe runs in Qasr start with mid-rise buildings having internal waste stacks and limited space for horizontal runs. We extend cold and hot water from roof tanks and connect every bathroom and kitchen with separate waste pipes before they join the stack. Lines are pressurised to check for leaks and every measurement is marked on a live drawing. Handover is a tested, ready apartment.
Qasr houses near Qasr Co-op are mid-rise units with only 3 to 4 storeys and very tight waste stacks in corners. We cut carefully into raw concrete walls at each floor and lay waste pipes at a fall of one to two centimetres per metre toward the main stack. Kitchens are often offset from bathrooms in the plan, so we run kitchen waste under the slab to a point near the stack before rising up.
Qasr sits in Jahra governorate, a medium-density residential area where tight stacks require precise planning before the first concrete pour.
We test vertical stacks from roof to foundation by passing a test ball from top to bottom to check for blockages or wrong bends.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use smaller diameter pipes (32 mm) than bathroom waste (50 mm) and run them horizontally at one centimetre fall per metre. If space is very tight we place part of the run above floor first, then below after levelling.
We run a long horizontal pipe under the slab with inspection eyes every three metres for access and cleaning. The pipe maintains steady fall and we avoid sharp angles that could trap water.