PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Capital
Flexible PEX runs in Rai extend from the main line into the shopping centre, retail outlet or office. We separate cold and hot feeds and direct them to bathrooms, kitchens and toilets with easy-swap fittings. All branches are tested under full pressure after installation. Flexibility lets us avoid crossings with electrical and cooling systems.
The Rai commercial zone around The Avenues, IKEA and bulk goods outlets has large buildings with high suspended ceilings and solid floors. Each shop or office in the mall has its own meter and local connections. PEX runs in these buildings need long above-ceiling paths that stay hidden from shoppers. We require precise documentation of tube routes so they do not cross existing ductwork or electrical conduit above the ceiling.
Rai sits in Kuwait governorate and is known for a modern commercial zone with shopping centres, retail outlets and industrial suppliers.
PEX networks in Rai shops are held under continuous pressure for two hours because water use in public kitchens and bathrooms is intermittent.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the main line from the street enters the mall then splits into separate PEX branches for each shop. We install a meter on each branch at the entry then local distribution with small PEX tubes.
We install an instant electric heater under the sink or a small storage heater in the kitchen cabinet. PEX lines reach the heater without issue because they tolerate moderate temperatures.
