Frame and tray level
Frame and tray set perfectly flat so water drains fully

Farwaniya
Shower cabin installation in Khitan Al-Jadida starts by setting the metal frame level on a flat floor and checking it is square. We run the supply line from the ceiling or wall, fit the showerhead and test pressure before fixing the tempered glass. Every edge is sealed with mould-resistant silicone and the floor trap below is tested for watertightness.
Most apartments in Khitan Al-Jadida have narrow bathrooms with existing tile walls, and the cabin frame needs clear floor space away from the central floor trap. We check the gradient of the existing tile first, because a low spot under the cabin frame stops water draining if it sits higher than the trap. Once the frame is levelled we tighten bolts gradually and watch the tempered glass during tightening to avoid over-pressure at the corners.
Khitan Al-Jadida lies in Farwaniya governorate, a modern apartment district where standard bathrooms require tightly adjusted cabin frames.
Before closing the cabin, the shower runs at full flow for one minute to check for water leaks at every joint.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, if the tile is sound and the floor level. We anchor the frame on the existing tile and seal the gap with silicone. If we find a broken piece we extract it and build up that spot.
Usually four to six hours from measuring the space to final testing and cleanup. This includes levelling the frame, fitting glass, securing pipes and sealing with silicone.
