Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Khitan Al-Jadida begins by checking the drain location and confirming existing pipes reach the bathroom. We set the tub level, seal the waste connection tightly and pressure-test for leaks before finishing.
Khitan Al-Jadida homes, mostly built in the past decade, have spacious bathrooms with modern tiled floors. A bathtub sits on a rigid base that needs a perfectly level foundation or tiles crack under use. We check the floor with a level, place cement packing under the base and confirm the waste pipe fall.
Khitan Al-Jadida lies in Farwaniya governorate, a modern residential district where most master bathrooms contain a bathtub.
Every waste joint is tested with running water for minutes before handover because new pipework requires full verification.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We check the bathroom floor with a level and raise any low spots with cement packing before fixing the tub base. Then we run water through the drain for several minutes to confirm no leaks.
Only if pipes are aged, blocked or undersized for the outlet. We inspect the line from bathroom to main stack with a scope before starting work.
