Site and drain check
Measure the bay and confirm drain fall before moving the unit

Farwaniya
Jacuzzi installation in Khitan Al-Jadida starts with checking the tub position, floor level and drain line. We confirm the slope allows quick discharge, then connect the jet pump and finish all electrical and water connections before final testing.
Most modern homes in Khitan Al-Jadida have spacious bathrooms with marble or ceramic and floors sloped toward the drain. This makes jacuzzi fitting easier because waste drainage sits near where the tub will go. We measure the trap height and slope, and relocate the main discharge outlet if needed when the tub is set back. The jet pump requires a separate earthed power socket, which we check and install before the tub is filled.
Khitan Al-Jadida is in Farwaniya governorate, a modern residential area of family houses and upper storeys with spacious bathrooms served by central waste pipework.
Before handover, all jets run under full pressure for ten minutes while we check every water and electrical joint for safety and leaks.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the trap sits directly below or beside the tub position. We test the waste line slope first to ensure it can handle the large volume of water the jacuzzi drains in minutes.
Yes, the pump needs a dedicated earthed socket separate from other bathroom circuits. We install an RCD breaker and test it before connecting the pump.
