Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
Ablution basin installation in Shuaiba Industrial starts by mapping water and waste lines in industrial buildings and admin blocks. We locate the nearest floor trap, run supply and waste with a steady fall, and test every joint before handover.
Shuaiba Industrial buildings sit on thick concrete foundations and raised ground slabs, so waste pipes often run beneath the slab or within block walls. When fitting a basin near a production area we check existing drawings to avoid buried pipes and electrical cables. Floor traps in these buildings are deep with strong falls, so we can run waste confidently without fear of standing water.
Shuaiba Industrial lies in Ahmadi governorate, an industrial zone of refineries and processing plants with separate sanitation facilities for workers and staff.
All waste lines in industrial buildings are tested under full flow for a full minute before floor covers are replaced.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request the building's original drawings and map existing waste runs before opening any new channel. If the route is unclear we open small test holes to confirm a safe path.
The basin itself needs no special approval, but its location must be away from machinery and hazardous materials. We consult the building manager to choose a safe and accessible spot.
