Site and drain check
Measure the bay and confirm drain fall before moving the unit

Ahmadi
Jacuzzi installation in Shuaiba Industrial begins with positioning the unit on prepared tile floor and measuring hot and cold supply runs. We connect the jet pump and control box, test each nozzle at operating pressure and verify no leaks in the drain.
Most Shuaiba Industrial facilities have large staff bathrooms with heavy tile walls and a set fall toward a central floor trap. A jacuzzi needs a larger trap or twin waste lines because water flow during jet operation exceeds a single drain. We measure trap size and distance from the jacuzzi body before lifting, and if fall is insufficient we raise the unit on a concrete plinth.
Shuaiba Industrial sits in Ahmadi governorate near the KIPIC petrochemical complex, where company facilities and maritime fleet operations are concentrated.
Before handover we fill the jacuzzi and run jets for five minutes because new pipework requires thorough pressure testing.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the existing trap is only 100 mm it is too small, because a jacuzzi needs 150 mm minimum during rapid drainage. We either raise the unit or run a second waste line to the same trap.
Yes, because heat loss through exposed metal pipework drops water temperature before it reaches the pump. We wrap pipes in 13 mm foam insulation before the tile is fixed.
