Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation in Shuaiba Industrial begins by checking the floor outlet and levelling the tub base perfectly horizontal. We run hot and cold supply from the main manifold, connect the waste to the outlet and fill the tub to test every joint under pressure.
Most bathrooms in Shuaiba's industrial and residential buildings have a central floor outlet positioned close to where the tub goes, and floors are usually tiled for easy cleaning. We ensure the tub base is perfectly level before installation because even a small slope stops water draining when empty. We support the tub on all four sides with cement blocks and lay a waterproof layer underneath to stop seepage to the floor below.
Shuaiba Industrial lies in Ahmadi governorate and houses petrochemical factories and major industrial facilities that serve attached residential quarters.
After connection, the tub is filled completely and left for one hour to reveal any leaks in the joints or floor.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We lay a flexible waterproof membrane under the tub base that covers the area around the outlet. Then we test the drain and connections under full pressure before sealing any wall cavity.
We use self-levelling cement mortar under the tub to correct minor slopes. If the difference is too large, we raise the tub supports equally from all corners.
