Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Firdous starts by checking the guest or main bathroom and the drain under the floor. We place the unit in the best position, connect waste to the nearest trap and pressure-test everything before handover.
Firdous houses are relatively modern and ground bathrooms have metal or plastic drainage channels with shallow falls. A bathtub needs a relatively high outlet point because shallow slope means water can back up if the point is too low. We flush each drain section with test water before starting actual installation.
Firdous is in Farwaniya near Sixth Ring Road, a district of modern residential buildings with standardized bathroom floor levels.
We test drainage with hot water for three minutes because bathtub use involves hot water and pipes shift slightly when heated.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually not, because supply pipes in modern bathrooms run in dedicated walls or chase pipes. We run hot and cold water together during installation to confirm no joint leaks.
Four to six hours including inspection, testing and cleanup. If the floor is unstable or drainage needs repair, time may increase.
