Waste outlet check
Height and position confirmed before the shower tray is set.

Jahra
Shower installation in Jahra Industrial Area serves large workshops and heavy operations needing robust, reliable wash stations. We mount solid metal heads, test line pressure under full load and verify seals against industrial moisture before handover.
Jahra Industrial factories are large and heavily insulated with intense summer heat, and wash areas are built with brick or insulated steel walls. Pipes need larger diameter than usual because consumption is heavy and simultaneous. We run pipes on the surface sometimes and shield them with metal covers, or cut into walls and coat pipes with strong industrial epoxy paint. We install a fine mesh strainer before the showerhead to protect spray ports from sediment.
Jahra Industrial Area sits in Jahra governorate, a vast zone housing large factories and heavy storage facilities.
We temporarily fit a pressure gauge at the showerhead because long factory lines lose noticeable pressure.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a larger main pipe diameter right to the final branch, which keeps water speed and pressure high. We test pressure at the farthest point from the pump before handover.
We install a fine mesh strainer with small openings right before the head. The filter cleans easily with a wire brush and protects spray ports from clogging.
