Position and height
correct mounting height marked before any fixing begins

Ahmadi
Washbasin installation in Shuaiba Industrial starts by understanding the admin building or work area layout. We locate the main drain line, run water pipes from central supply and mount the basin level to drain instantly with no pooling.
Shuaiba Industrial buildings have work-station basins and support washrooms spread across workshops and offices, each with an independent drain point under thick industrial flooring. We open the floor carefully because metal and electrical lines run alongside water pipes, and we test the fall with a test pipe before fixing. Where a basin sits close to the main collection point, the pipe run stays short and reduces leak risk at joints.
Shuaiba Industrial lies in Ahmadi governorate and houses the KIPIC petrochemical complex, where buildings spread across wide spaces with centralised drainage systems.
Every basin is tested under full flow for one minute before final sign-off because small leaks hide at low pressure.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but it requires laying a new waste line across the existing floor toward the trap. We cut a straight path with the minimum fall needed and test the flow before resurfacing.
We apply thread seal tape and compress metal ferrule fittings by hand at each joint. Then we run water under full pressure to inspect every point before handover.
